• Page last updated on: 01 February 2019
  • Skip to Main Content | Screen Reader Access | A A+ A++ | |
  • A
  • A

Private Entrepreneurs Guarantee (PEG) Scheme

Construction of godown in PPP mode:

The scheme is in operation in 22 states. Out of the sanctioned capacity of 150.76 lakh MT, 142.12 lakh MT storage capacity has been completed as on 31.12.2018. The details are given below:

SL

State

Capacity Sanctioned (LMT)

Work Completed (LMT)

1

Andhra Pradesh

1.13

0.88

2

Bihar

4.19

3.40

3

Chhattisgarh

5.37

5.37

4

Gujarat

0.50

0.50

5

Haryana

35.02

34.37

6

Himachal Pradesh

1.16

0.24

7

Jammu & Kashmir

2.56

1.62

8

Jharkhand

3.93

2.33

9

Karnataka

2.41

2.41

10

Kerala

0.05

0.05

11

Madhya Pradesh

13.80

13.03

12

Maharashtra

5.63

5.63

13

Odisha

3.60

3.53

14

Punjab

44.69

44.69

15

Rajasthan

2.35

2.35

16

Tamil Nadu

2.65

2.55

17

Telengana

3.19

2.69

18

Uttar Pradesh

0.10

0.10

19

Uttarakhand

15.26

14.64

20

West Bengal

2.44

1.49

21

Assam

0.75

0.25

22

Meghalaya

0.00

0.00

Total

150.76

142.12

*****